
Watch S2 "Junk Mail Cooling and Fuel Plumbing" with Fubo for $0 Today
The "Junk Mail" 1978 postal Jeep project continues with wiring, cooling and fuel systems work, and fabricating the exhaust system before firing it up for the first time.
The "Junk Mail" 1978 postal Jeep project continues with wiring, cooling and fuel systems work, and fabricating the exhaust system before firing it up for the first time.
More episodes
Carcass
S2 "Junk Mail Wrap Up and Payoff"The 1978 postal Jeep is buttoned up then hits the trails on the rocks.
Carcass
S2, EP17 "EFI Swap Lets Junk Mail DJ5 Conquer the Trails"Project Junk Mail is back into the shop to address some trail problems; upgrading the carburetor for an EFI system giving a better performance on steep terrain; giving the steering a boost before heading back out on the trails.
Carcass
S3, EP5 "Abandoned Chevy Silverado Project Part 1: Rust and Dent Repair Tech"Tips on how to repair rusty trouble spots and remove dents; a walk through of getting a project primed.
Carcass
S3, EP9 "Abandoned Chevy Silverado Project Part 2: Junkyard Motor Refresh"The crew source a drivetrain for a 1996 Chevy Silverado.
Carcass
S5, EP13 "Revamped Tahoe Part 1"The Carcass crew brings in a road worn 1996 4X4 two door Tahoe with plans to convert it into the low production two-wheel drive version; they'll start by replacing the blue-smoke-puffing V8 and drop in a new power plant for better performance and reliability; adding a suspension to start the transformation.