
Watch Carcass with Fubo for $0 Today
A '72 Camaro gets stripped down for a fresh coat of paint and a race-ready wrap.
S2 "Junk Mail Cooling and Fuel Plumbing"
The "Junk Mail" 1978 postal Jeep project continues with wiring, cooling and fuel systems work, and fabricating the exhaust system before firing it up for the first time.
S2 "Junk Mail Wrap Up and Payoff"
The 1978 postal Jeep is buttoned up then hits the trails on the rocks.
S2, EP17 "EFI Swap Lets Junk Mail DJ5 Conquer the Trails"
Project Junk Mail is back into the shop to address some trail problems; upgrading the carburetor for an EFI system giving a better performance on steep terrain; giving the steering a boost before heading back out on the trails.
S1, EP10 "Drifting Trailblazer"
Jeremy and Jimmy wear out a pair of tires testing their Trailblazer SS in a drift like fashion. Upgrades are already on their minds as they shed some pounds for a better drifting truck.
S5, EP17 "Honda Powered"
A '72 Camaro gets stripped down for a fresh coat of paint and a race-ready wrap.